COO-Trois-Pont Pumped Storage Upgrade

  • Pumped Storage
  • COO
  • Refurbishment
  • Uprating
Client
Electrabel
Country
Belgium
Period
2002 – 2020
Olivier Bisch
Director of the Electromechanical and Rehabilitation Unit
Ponte en contacto
Servicios prestados
  • Pre-Feasibility & Feasibility study
  • Owner's or Lender's Engineer
  • Technical & regulatory consultancy

The Challenge

Increase the storage and power performance of the existing Coo pumpedstorage plant by 7.5% while safeguarding reliable operations for the next 40 years. The upgrade had to be conceived and delivered on a live, gridcritical asset, balancing stringent technical, scheduling and regulatory requirements.

The Solution

Modification and expansion of the spillway and flood release facilities.

The Impact

Extended lifetime and increased capacity, reinforcing Belgium’s grid flexibility.